IWWTP
Project Details

Industrial WW Treatment Plant - 250 M3/Day

  • Client
    Saudi Aramco
  • Engineering Consultant
    IE-Consult Office
  • Technical Partner
    H2O Tech. Factory
  • Date
    Dec. 15, 2017

Project Summery

Saudi Aramco’s JTTF current disposal of Crude Oil Tanks dewatering is via three Evaporation Ponds. However, the current treatment facilities does not meet marine discharge limits of the evaporation pond effluent. Therefore, FK & Partner Co. with its Technical Partner H2O Tech provide effective solutions based on physical, chemical and advanced treatment to treat the JTTF evaporation pond wastewater for disposal into the marine environment, regardless of any changes in feed quality. The plant was installed under Build, Own, and Operate (BOO) by FK & Partner Company. The selected design is to treat and dispose of 250 m3/day of industrial wastewater.

  • Chemical-Physical Treatment Process.
  • Fully Automatic Operation - Controlled by PLC.
  • Highest Effluent Specs - Marine Discharge Quality.
  • Fully Equipped Portable Laboratory at Site